Home
About Us
Co-Lab Values
Co-Lab Board & SLT
Our Councils
Co-Lab Careers
Working Parties
Case Studies
Reports
EMs Welcome Hub
Shared Services
Geospatial Projects and Services
Aerial Photos of the Waikato Region
PGF WLASS LiDAR Project
WaiGIS
Waikato Open Data Hub
Energy & Carbon Management
Co-Lab Building Services (CBS)
RITS (Regional Infrastructure Technical Specifications)
RITS Drawings
WRC Standard Drawings
RITS Documents
RITS V2 2025
Procurement
Joint contracts
Legal Services Panel
Professional Services Panel
RIMU
RATA
RATA Team
Roading Asset Valuation (RRAVP)
Stock Underpasses (SURP)
RATA Portfolio
Resource Consent Application Forms
Shared Valuation Data Service
Waikato Building Consent Group (Build Waikato)
Water Services
Sampling and Analysis
Trade Waste
Smart Water
Team Leaders
WRTM (Waikato Regional Transport Model)
Access
Upgrade Programme
Document Store
H&S Pre-Qual
Totika
Health & Safety Pre-qualification Scheme
Regional ED
Ideas
Contact
Linkedin
You are here:
\
Shared Services
\
Work In Progress
Update acceptable products already evaluated
(Project Manager) completed but ongoing
Resolve road widths and then remove links to DP (nearing completion with RATA)
SW suggestions (raised by Beca Hamilton) long term
Section 2 Earthworks – consider TCC’s version as an option (raised by Aecom) draft almost completed by T& T in conjunction with Rotorua Lakes DC
M4 vs GAP40 base material (WaiDC with RATA)
completed
Add As built for rain gardens (HCC)
completed
Update As built drawing examples to templates for ease of use (CKL) long term
Add Town entrance threshold design (raised by M-P DC) with RATA
Review and include new terminology drawing D3.1.1A (WaiDC)
completed
Add Private way Producer Statements (WaiDC)
completed
Add Rural Crossing drawing (WaiDC)
completed
Review old Waipa DC rural Roading drawings for possible inclusion (Surveyors Institute) long term
Review roundabout kerb details (HCC) to action
Review need for lighting secondary flow paths that use cycleways/walkways (HCC)
completed
Consider wire rope barrier details (HCC)
completed
Wetland drawing Figure 4-6 needs updating, and further details on reducing silting in soakage devices (HCC)
completed
Add wetlands sign board (HCC)
completed
Add Way Finder cycleway signage (HCC)
completed