Water Supply Drawings

LinkDrawingName
OpenD6.1Typical Urban Water Supply Network Layout
OpenD6.2Sluice Valve Details
OpenD6.3Fire Hydrant Details
OpenD6.4Valve Indicator And Post Details
OpenD6.5Ridermain In A Cul De Sac
OpenD6.620Mm Metered And Unmetered Service Connections - On Demand And Restricted Flow Supplies
OpenD6.7Dn20 Metered & Unmetered Service Connections On Demand
OpenD6.8Dn50 Meter Connection
OpenD6.9Dn100 And Dn150 Meter Connections
OpenD6.10Water Connections Layout
OpenD6.11Flush Out Valve Assembly
OpenD6.12Location Of Services In Transport Corridor
OpenD6.13Shared Trench Standard Detail For Right Of Way/ Shared Accessway
OpenD1.3 Water As-Built Plan

IMPORTANT - RITS Announcement

LINZ has now made it mandatory for all councils to move from Moturiki Datum1953 (and others) to New Zealand Vertical Datum 2016 (NZVD2016) from 1 July 2024. So on 1 July 2024 all as-builts and data sheets will be required to be to NZVD2016. Note that some councils in the Waikato have already made this change.