You are here: \ Shared Services \ RITS (Regional Infrastructure Technical Specifications) \ RITS Drawings \ Wastewater Drawings
Link | Drawing | Name | Last Updated |
|---|---|---|---|
| Open | D5.1 | DN1050 - DN1350 Manholes | |
| Open | D5.2 | Typical Dimensions For Manholes Greater Than DN1350 | |
| Open | D5.3 | Shallow Manhole/Chamber | |
| Open | D5.4 | Lateral Connection | |
| Open | D5.5 | Anti Scour Blocks For Steep Drainage Pipes | |
| Open | D5.6 | Building Over And Adjacent To Public Wastewater Or Stormwater Pipelines | |
| Open | D5.7 | Wastewater Pump Station Site Plan Layout | |
| Open | D5.8 | Wastewater Pumping Station Cross Section | |
| Open | D5.9 | Standard Wastewater Pumping Station For Flygt 3085 3102 And 3127 Pumps | |
| Open | D5.10 | Wastewater Pump Station Upper Section Reinforcing | |
| Open | D5.11 | Wastewater Pump Station Lid Frame | |
| Open | D5.12 | Wastewater Pump Station Lid Frame Detail | |
| Open | D5.13 | Wastewater Pump Station Lid Frame Detail | |
| Open | D5.14 | Wastewater Pump Station Lid Details | |
| Open | D5.15 | Wet Well Secondary Lids | |
| Open | D5.16 | Wastewater Pump Station Storage Plan | |
| Open | D5.17 | Wastewater Pump Station Section | |
| Open | D5.18 | Wastewater Pump Station Storage Ends Elevation And Details | |
| Open | D5.19 | Control Cabinet Plinth & SPS Flow Meter | |
| Open | D5.20 | Wastewater Pump Station Water Backflow Preventation | |
| Open | D5.21 | Wastewater Pump Station Water Backflow Preventation Cage | |
| Open | D5.22 | Wastewater Connections Layout | |
| Open | D1.1 | Wastewater As-Built Plan |